See the Difference We Make

Drag the slider to reveal the transformation. Each project showcases the Casey Building Group commitment to exceptional results.

Drag the handle left or right to reveal the transformation

Bright modern open kitchen with white quartz island and custom cabinetry, natural light
After
Dark cramped outdated kitchen with old cabinets and poor lighting, dated 1970s style
Before
Kitchen Renovation

Galley Kitchen to Open Concept

Timeline
8 weeks

A cramped 1970s galley kitchen transformed into a bright, open-concept culinary space with a 9-foot island and custom cabinetry throughout.

ScopeFull demolition, structural wall removal, new cabinetry, quartz countertops, and appliance package.
MaterialsQuartz countertops, shaker cabinetry, subway tile, hardwood flooring
Elegant modern bathroom with marble tile, frameless shower and freestanding tub
After
Outdated bathroom with old fixtures and dated tile, dim lighting
Before
Bathroom Remodel

Builder Bath to Spa Retreat

Timeline
5 weeks

A basic builder-grade bathroom with outdated fixtures and pink tile was transformed into a serene spa-inspired retreat with heated floors and a walk-in shower.

ScopeFull gut renovation, new shower, heated floors, custom vanity, and all new fixtures.
MaterialsCarrara marble, frameless glass, radiant heating, custom vanity
Modern open office with glass partitions, polished floors and natural light
After
Old corporate office with cubicles and drop ceiling tiles, fluorescent lighting
Before
Office Renovation

Dated Office to Modern Workspace

Timeline
6 weeks

A traditional corporate office with cubicles and drop ceilings was opened up into a modern, collaborative workspace with glass partitions and natural light.

ScopeCeiling removal, partition installation, flooring, lighting, and reception redesign.
MaterialsPolished concrete, glass partitions, acoustic panels, LED lighting
Modern boutique retail space with custom wood displays and warm lighting
After
Empty commercial shell space with bare concrete floors and exposed walls
Before
Commercial Build-Out

Empty Shell to Boutique Retail

Timeline
4 weeks

A raw commercial shell was transformed into a premium boutique retail space with custom display fixtures, fitting rooms, and atmospheric lighting in under 4 weeks.

ScopeFull build-out from shell: flooring, lighting, display systems, fitting rooms, POS station.
MaterialsReclaimed wood, polished concrete, track lighting, custom millwork
Modern renovated home exterior with Hardie siding, stone accents and covered porch
After
Older ranch house with dated aluminum siding and minimal landscaping, worn exterior
Before
Exterior Redesign

Tired Ranch to Modern Exterior

Timeline
3 weeks

A 1960s ranch home with aging aluminum siding was given a complete exterior makeover with Hardie board siding, stone veneer accents, and a new covered front porch.

ScopeSiding replacement, stone veneer installation, new windows, front porch addition.
MaterialsJames Hardie siding, architectural stone veneer, Andersen windows, composite decking
Start Your Project

Ready to Transform Your Space?

Get a no-obligation estimate from Casey Building Group LLC. We'll assess your project needs and provide a detailed plan within 48 hours.